As with all fixed-rotation systems, the base plate is integrated into the post. The lower bearing rope is led through a guidance attached to the base plate having a curved surface both horizontally and vertically to assist deflection of the rope. The base of the post is secured to the foundation/subsurface through three bolts or rock anchors.